Follow us:-

GB/T 3091-2008 Q345B welded steel pipes

  • 195 Views
  • 11-May-2024

Q345A welded steel pipes is a low-carbon alloy steel (c <0.2%) which under GB/T 3091-2008 standard, Q345A welded steel pipes have comprehensive performance, low temperature performance, cold stamping performance, welding performance and cutting performance. Widely used in bridges, vehicles, ships, construction, pressure vessels, the surface can be painted black paint, varnish, rust oil, hot dip galvanized, cold galvanized, 3PE and so on.

GB/T 3091-2008 Q345B welded steel pipes Chemical composition

chemical composition of Q345B

Grade

Class

C

Mn

Si

S

P

 

 

no more than

Q345

B

<=0.2

<=1.7

<=0.5

0.035

0.035

Q345B welded steel pipes Mechanical properties

mechanical property of Q345B  

Grade

lowder yield

Tensile

Extensibility after

strength Rel/N/MM^2

strength

fracture A/%

no less than

R/N/MM^2

no less than

t<=16mm

        T>16mm

no less than

D<=168.3MM

D>168.3mm

Q345B

345

325

470

13

18

If you are looking for the appropriate GB/T 3091 Q345B welded pipe products, please contact us, we will give you a detailed answer, we are maintained at more than 1,000 tons per month GB/T 3091-2008 Q345B welded steel pipes stock, to meet your needs , Welcome to inquire.

Related Post

304 Stainless Steel Plate

Chemical Composition

40CrNi2MoA

40CrNi2MoA forged round bar, 40CrNi2MoA hot rolled round bar, 40CrNi2MoA steel bar, 40CrNi2MoA alloy round bar, 40CrNi2MoA alloy structure bar, Henan KUNFENG offer high quality 40CrNi2MoA round bar.

S25C Hot rolled steel bar, S25C Forged steel bar S25C is under JIS 4051 standard

S25C features 1.good hardness 2.good toughness 3.good plasticity 4.good strength Common size for steel bar: Common diameter for hot rolled steel bar: 8mm to 70mm Common diameter for forged steel bar: 80mm to 1200mm Package: standard seaworthy packing

PYB-900C Cone crusher crushing wall manufacturer

crushing wall is fixed to the body with a conical crusher head,cast zinc alloy between the two,after new installation or replacement of a new cone crusher wall work 6-8 hours,you should check its fastening,found loose immediately tightened.