Follow us:-

GB/T13793-2008 Q345B welded steel pipe

  • 252 Views
  • 11-May-2024

GB/T13793-2008 Q345B welded steel pipe belongs to the low carbon alloy steel (c <0.2%),Q345B welded steel pipe’s comprehensive performance is good, the low temperature performance is good, the cold stamping performance, the welding performance and the cutting performance is good, the surface may paint black varnish, varnish, antirust oil, hot galvanizing, cold Galvanized, 3PE, etc. Q345B welded steel pipes are widely used in bridges, vehicles, ships, construction, pressure vessels.

Q345B welded steel pipes Chemical composition

chemical composition of Q345B

Grade

Class

C

Mn

Si

S

P

 

 

no more than

Q345

B

<=0.2

<=1.7

<=0.5

0.035

0.035

GB/T13793-2008 Q345B welded steel pipe Mechanical properties

mechanical property of Q345B

Grade

 yield

Tensile

Elongation after

strength Rel/N/MM^2

strength

fracture A/%

 

R/N/MM^2

 

no less than

Q345B

345

470

18

Q345B welded steel pipe under GB/T13793 standard is KUNFENG Steel mainly steel grade, If you are interested,please feel free to contact us, we can provide Q345B welded steel pipe with high quality and competitive price, to provide you with the most quality service, look forward to cooperating with you, please call.

Related Post

304 Stainless Steel Plate

Chemical Composition

40CrNi2MoA

40CrNi2MoA forged round bar, 40CrNi2MoA hot rolled round bar, 40CrNi2MoA steel bar, 40CrNi2MoA alloy round bar, 40CrNi2MoA alloy structure bar, Henan KUNFENG offer high quality 40CrNi2MoA round bar.

S25C Hot rolled steel bar, S25C Forged steel bar S25C is under JIS 4051 standard

S25C features 1.good hardness 2.good toughness 3.good plasticity 4.good strength Common size for steel bar: Common diameter for hot rolled steel bar: 8mm to 70mm Common diameter for forged steel bar: 80mm to 1200mm Package: standard seaworthy packing

PYB-900C Cone crusher crushing wall manufacturer

crushing wall is fixed to the body with a conical crusher head,cast zinc alloy between the two,after new installation or replacement of a new cone crusher wall work 6-8 hours,you should check its fastening,found loose immediately tightened.